Abu Dhabi, 27 October 2025 – Abu Dhabi Transport Company (ADT) has announced the release of an Expression of Interest (EOI) inviting suitably qualified Rolling Stock and Civil entities to lead the Design & Build (D&B) package for the Abu Dhabi Light Rail Transit Line 4 (LRT4) Project.
The LRT4 development forms a major step in advancing Abu Dhabi’s multimodal public transport network. The 19-kilometre line will feature 23 stations connecting Zayed International Airport, Al Raha Beach, and Yas Island, supported by a new depot facility to accommodate the operational requirements of the line.
Under a single-package D&B contract, the selected lead entity will be responsible for the complete design, procurement, construction, testing, commissioning, and certification of the LRT4 line. The work includes civil, and mechanical, electrical and plumbing (MEP) infrastructure, stations, trackwork, rolling stock (25 trams), and railway systems such as signaling, communications, Supervisory Control and Data Acquisition (SCADA), power, and depot facilities.
"The launch of this EOI reflects the ongoing strategic vision of Abu Dhabi’s Leadership in advancing a smart, integrated transport ecosystem. ADT is proud to contribute to delivering projects that supports the Emirate’s economic diversification and urban sustainability."