Status

Design and Build Contract

The contract covering design and build of the QED HUB including Civil, MEP and Landscaping along with the systems integration was awarded in August 2025. Work on site is underway, with an expected completion date of Q2, 2026.

Systems Contract

The contract to design, manufacture, install, test, and commission the systems including the autonomous PODs, the guidance rail and associated power systems, signaling and telecommunications was awarded in February 2025. The first prototype POD was unveiled by ADT during the 2025 Global Rail Exhibition and Conference and is currently under off-site dynamic testing in Abu Dhabi. Other systems assets are on site, awaiting installation in line with the schedule.

The purpose of the QED HUB

01

Qualification of Technology

To test and qualify the transport technology under Abu Dhabi’s unique climatic conditions, ensuring that the system remains safe, reliable, and resilient. Successful qualification will confirm the technology’s viability to support the Emirate’s future public transport requirements.

Qualification of Technology

Education and Public Awareness

To collect data and insights that will be used to educate the public about the technology, its mode of operation, capabilities, and potential use cases-fostering community understanding and acceptance.

Education and Public Awareness

Demonstration to Stakeholders

To showcase the system to future clients, partners, and interested parties, highlighting its benefits, applications, and integration potential within Abu Dhabi's wider multimodal transport network.

Demonstration to Stakeholders

The QED HUB is located on Al Reem Island

The QED HUB is located 
on Al Reem Island
Get Directions

Urbanloop Key Facts

Minimum radius
8 meters
Maximum speed
70 km/h
Average/commercial speed
30 km/h
Possible urban insertion
At grade, elevated and underground (up to 10% gradient)
Power consumption
0.1 kW / km / passenger 
Width of double track 
3 meters
Operational voltage
72 DC (Safety Extra-Low Voltage SELV)
POD capacities
4 seated persons / 8 persons (4 seated) / 12 persons (4 seated)
Interior AC Performance
24 °C +/- 2°C in all conditions
Axle loads
650 kg
    About ADTServicesADT Urbanloop QED HUBNews & Events
    Social ResponsibilityFAQsContact Us
    Stay Connected
    LinkedinXInstagram
    Our Newsletter
    © 2025 ADT. All Rights Reserved.
    Abu Dhabi Transport Company
    Terms of UsePrivacy Policy
    Abu Dhabi Transport Company